Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap

Products

Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap

Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap

High Quality Brass Insert Pipe Fitting with Five Years Warranty FAQ:Q1.Can I get free samples?A: Yes,we can provide you

Send your inquiry

DESCRIPTION

Basic Info.
Model NO. ZTN-05048
Material Copper
Connection Thread
Thraed G NPT R ISO7
Sanding Sanding
Temper 280°-400°
Colour Plated Nickel Plated Chrome
Brass Hpb57-3 Cw617 Dzr Lead Free Zinc Aluminium
Transport Package Pallet and Carton
Specification 1/2 3/4 1
Trademark ZTN
Origin China
HS Code 741209000
Production Capacity 500000/Days
Product Description
High Quality Brass Insert Pipe Fitting with Five Years Warranty

Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap

1.Material grades: BRASS ,ZINC , ALUMINIUM
2.Thread:NPT, BSP, BSPT, UNF, ISO, SAE etc.
3.Zero leakage even under tough working conditions.
4.All pipe threads meet the requirements of ASME/ANSI B 1.20.1(1983) for tapered pipe threads (NPT).
5.Working pressures calculated in accordance with Power Piping Code ANSI B31.1, Refiner Piping Code ASME/ANSI B31.3 and section VIII of ASME Boiler & Pressure Vessel Code.
6.Available in wide variety of configurations.

Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap


Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap


Factory Ball Valve Dbb 3 8 Ball Valve Pex Steam Trap


FAQ:Q1.Can I get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs. Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.Q3. Are you a trading company or a manufacturer? A: We are a manufacturer.Q4. What is your payment term? A:Normally T/T 50% in advance, balance to be paid before delivery. Q5: What is your main market? A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe. Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.Q7. What about the lead time?
A:Sample needs 7 days, mass production time needs 25 days.